Chiveve River Project in Beira, Mosambique
A project done with our partner TVD China in the harbour city of BEIRA (Mosambique).
![BEIRA: Installation situation of the lift gate valves between river (right) and port (left) DCIM100MEDIADJI_0250.JPG](https://www.k-vt.de/wp-content/uploads/2021/06/Beira_Chiveve_River_Project.jpg)
![Assembling of one of the hydraulic gates BEIRA-mmexport1473714206981_resized_20160913_051458157](https://www.k-vt.de/wp-content/uploads/2020/03/mmexport1473714206981_resized_20160913_051458157.jpg)
![BEIRA: Installation situation Beira-sluice-gate-valve](https://www.k-vt.de/wp-content/uploads/2021/06/Beira-sluice-gate-valve.jpg)
![BEIRA: Installation site Beira-construction-site](https://www.k-vt.de/wp-content/uploads/2021/06/Beira-construction-site.jpg)
Bring me back to the KVT-News!
A project done with our partner TVD China in the harbour city of BEIRA (Mosambique).
Bring me back to the KVT-News!